Key takeaways
- Subcontractor risk transfer remains one of the most common gaps in Queensland construction claims, and it usually surfaces only after a loss has already happened.
- A Certificate of Currency confirms cover on the day it's issued, not for the life of a project, which is why lapsed or cancelled subcontractor policies keep catching builders out.
- Exclusions buried in a subcontractor's policy, things like height or depth restrictions, can flow upstream and land on the builder's own claims record.
- Contract wording around indemnity and insurance needs to match the cover actually in place, not just look right on paper.
- A short list of minimum standards, paired with a regular audit, closes most of these gaps before they turn into disputes.
The common disconnects between contracts and insurance cover on construction projects
For many builders, subcontractor risk transfer sits somewhere between a contractual requirement and an administrative task: certificates get collected, clauses go into the contract, and the subcontractor carries the right cover on paper. Unless something goes wrong, it's easy to assume that's the end of it.
That assumption is usually where the trouble starts. A contract can look like it transfers the risk while the insurance coverage behind it doesn't agree, and the gap between the two only shows up once a claim forces the question.
It's a gap that's getting harder to manage. Subcontracting chains are longer, QBCC licensing adds another layer to track, and the claims environment keeps shifting under builders' feet. Regional Insurance Brokers has spent decades working alongside Queensland builders on exactly this problem, and this article walks through where the gaps tend to show up and what's worth doing about them.
Why subcontractor risk remains a top claim driver
Ask any broker who works in the construction industry, and they'll tell you the same story keeps playing out: a subcontractor causes damage or injury, their insurance doesn't respond the way everyone assumed it would, and the builder is left carrying the cost, the delay, or both.
In practice, this may look like a civil contractor engaging a specialist subcontractor for a mid-value commercial project. The subcontractor holds public liability cover, and a Certificate of Currency is filed away at the start of the job. Partway through, an incident causes property damage, and the subcontractor's insurer starts questioning whether the work falls within the scope of the policy. While that dispute plays out, the builder, named on the head contract and carrying overall responsibility for the site, may be left covering the immediate costs.
And the impact rarely stops with the claim itself. There may be legal fees, project delays, and hours spent speaking with insurance companies and lawyers instead of working on-site. With subcontracting chains growing longer and margins getting tighter, risk transfer can’t be treated as something you check once and file away.
What to check beyond the Certificate of Currency
In Australia, the document that confirms a subcontractor's cover is a Certificate of Currency, sometimes called a Certificate of Insurance, or COI, overseas. It shows that a named insurance policy was active as at the date it was issued: the policy type, the insurer, the sum insured, and the period of cover.
However, a Certificate of Currency only captures a moment in time. It shows the policy was in place when the certificate was issued, but it doesn’t confirm that the cover is still active months later or that the subcontractor has continued paying the premium.
For example, a builder might collect a certificate from a subcontractor at project kick-off, confirming the policy is active at that time. Months later, the policy is cancelled for non-payment, but no further checks are carried out, so the cancellation goes unnoticed. If an incident occurs on site after that point, the certificate remains on file looking perfectly valid, even though the cover behind it no longer exists. The builder is left to cover costs that should have fallen to the subcontractor's insurer.
None of this takes much to fix. Ask for an updated certificate at set project milestones. Check the insured name and ABN match the subcontract and confirm the policy type and sum insured meet what the contract asks for. Small habits, but they catch most of these gaps well before they turn into a claim.

Policy exclusions that flow upstream
A Certificate of Currency confirms a policy exists. It won't tell you what that policy leaves out, and exclusions are where a surprising number of risk transfer problems start.
Public liability policies often carry exclusions tied to height, depth, or the kind of activity being performed. A subcontractor can hold what looks, on the surface, like perfectly adequate cover, while their policy carves out the exact work they've been engaged to do.
Take a commercial builder engaging a roofing subcontractor whose public liability policy excludes work above ten metres. An incident on a three-storey job leads to a claim the subcontractor's insurer declines. That exposure doesn't stay with the subcontractor. It flows upstream to the builder's own policy: a claim on their record, their excess, and pressure on their premium at renewal.
Catching this before work starts means looking past the certificate and into the wording itself. What height, depth, or type of work does the cover actually extend to? Are there activity-based exclusions relevant to this trade?
A broker who reads the policy wording, not just the certificate, is often the only one who picks this up before the incident rather than after it.
Contractual wording issues and their consequences
Risk transfer relies on the contract just as much as the insurance behind it. Indemnity clauses, hold harmless agreements, and insurance requirements all need to point in the same direction so responsibility is clear if a claim arises. If the wording is inconsistent, outdated, or copied across from an old contract, the lines of responsibility can quickly become blurred.
This may look like a builder using a standard subcontract with a broad indemnity clause drafted years earlier. Water damage occurs during a fit-out, and when the claim is lodged, both insurers start disputing who should carry the loss. Part of the problem is that the indemnity clause says one thing, while the insurance requirements elsewhere in the contract suggest another. What follows is months of legal back-and-forth, along with costs and delays neither business had allowed for.
The strongest contracts are the ones where each part supports the next. The indemnity and insurance clauses line up, the required cover types and limits are spelled out, and the wording is reviewed regularly rather than carried from one project to another
How contractual risk transfer audits work
Most builders check a subcontractor’s paperwork at the start of a project, then file it away and move on. A proper risk transfer audit turns that one-off check into an ongoing process, regularly reviewing the contracts, Certificates of Currency, and policy wording behind your subcontractor arrangements before a problem occurs.
It usually starts with the subcontract itself, checking that the indemnity and insurance clauses line up and that the required cover is named clearly. From there, it moves to the certificates on file, confirming they're current, correctly named, and cover the right entity. For higher-risk trades, it's also worth a look at the actual policy wording, rather than trusting the certificate on its own.
By the end, the builder has a clearer view of which subcontractors meet the required standards, where documents are missing, and which gaps need to be addressed before work continues.
Setting minimum insurance requirements for subcontractors
Every subcontract should spell out, in plain terms, what a subcontractor needs to hold before they set foot on site. At a minimum, that generally means public liability insurance at a limit that suits the project, plus professional indemnity cover for any trade providing design or engineering input.
Workers’ compensation needs care with sole traders. A sole trader generally can't cover themselves under WorkCover Queensland, but if they work a contract of service they may sill be treated as a worker, regardless of having an ABN. Builders should confirm the arragements and subcontractors who employ staff should hold their own WorkCover policy. For sole traders, personal accident and illness cover is usually the better fit.
It's also worth asking if the builder can be noted as an interested party on the subcontractor's public liability policy, or if a principal's indemnity extension is available. Where an insurer offers it, that gives the builder direct visibility of the subcontractor's cover, and sometimes a more direct path if a claim comes out of the subcontractor's work.
Don't wait for a claim to test your paperwork
Most builders find out whether their subcontractor risk transfer actually works at the worst possible time, mid-claim, with an insurer already asking hard questions. The better time to find out is now, on your own terms, while there's still room to fix what needs fixing.
It’s also worth remembering that Australia’s proportionate liability laws can affect where responsibility ultimately sits when several parties are involved in a loss. Because of that, contract wording should always be reviewed by a lawyer. Regional can help with the insurance side, identifying gaps early and helping builders put stronger processes in place before a claim exposes them.
Pull the file on your next three subcontracts. Check the certificates are current, the clauses agree with each other, and the cover matches the work being done. If any of that raises more questions than answers, Regional's team is here to help you work through it before it becomes a problem on site.
Is your subcontractor cover doing its job?
A risk transfer review is one of the simplest ways to find gaps in your contracts, certificates and policy wording before a claim does. If your subcontractor paperwork hasn't been checked since the job kicked off, it's time to start the conversation.